MANILA, Philippines — The government is eyeing the filing of charges against the Discayas over poor structural design and unfinished work of the Philippine Film Heritage Building (PFHB) in Intramuros, Manila, Malacañang said Thursday.
Palace Press Officer Claire Castro discovered the sloppy construction of the film center during her inspection of the PFHB that was supposed to be completed Sept. 4, 2025., This news data comes from:http://knlvjdq.052298.com
Castro said the PFHB was built by the Discaya-owned Great Pacific Builders and General Contractor Inc.

Govt eyes charges vs Discayas over 'unfinished' PH Film Heritage Building
"This building should be turned over now because that it's supposedly finished, Sept. 4, 2025. We can see now how it's built and why it's disappointing," Castro told reporters after inspecting the film center.
"And this building, its contractor is Great Pacific Builders and General Contractor Inc. This is one of the corporations of the Discayas," she added.
- Surfacing of WPS features ‘likely’ natural occurrence, not due to dumped crushed corals
- Super Sale: Pag-IBIG offers 40% off on foreclosed assets
- Russian drone, missile attack kills 14, injured 48 in Kyiv
- Putin meets Kim, praises North Korean troops in Russia
- China 'unstoppable', says Xi with Kim, Putin at his side
- Pag-IBIG: More than 25k register for socialized housing units under Expanded 4PH
- DILG to roll out nationwide unified 911 hotline on Sept. 11
- Thai cannabis-championing tycoon takes office as PM
- Heavy rains flood parts of Metro Manila anew
- Filipino fulfills dream of performing with K-pop group before home fans